Posts

Showing posts from June, 2004

2004-32 BDS llc. Addition, Westport, CT.

Image
Date: 2004 Project: Existing Conditions Drawings, Design, Design Development, Construction Documentation Team: Barros Design Services llc. Task: Provide Existing Conditions Drawings,  Design Development, Construction Documentation, Construction Administration assistance as requested. 3 phases of construction

2004-31 BDS llc, Addition & Alteration, Norwalk, CT.

Image
Date: 2004 Project: Measure Existing Conditions, Design, Design Development, Construction Documents. Team: Barros Design Services llc Telco Norwalk, Homeowner.